|
|
|
|
|
|
|
|
All mud
logging systems provide Engineering Application Programs
(EAP) to perform complex calculations, to obtain more
information, to analyze problem wells and mostly, to control
the situation easily and quickly and to aid in drilling
wells safely and economically.
|
|
|
|
|
|
|
|
|
|
Hydraulics |
|
Calculating
the pressure losses and other data for a variety of
flow conditions. |
|
|
Bit Hydraulics Optimization |
|
Optimizing
the best bit combination to maximise hydraulic horse
power or impact force. |
|
|
|
|
|
|
 |
|
|
Swab and Surge Analysis |
|
Calculating the swab
and surge pressures and EQMDs at the shoe and TD for
a number of tripping speeds. |
|
|
|
Lag and circulation |
|
Calculating the lag and circulation
data |
|
|
|
|
|
|
|
|
Costs Analyzing |
|
Calculating
and Analyzing drilling costs & bit costs to Increase
efficiencies. |
|
|
Deviation Program |
|
These
surveys aid in analyzing the well bore position from
directional survey data. Analysis of the well bore location
is essential to ensure a well intersects the required
reservoir target. |
|
|
Kick Program |
|
The kick program is used to make all
the calculations necessary for secondary well control
with kick. |
|
|
Geometry Program |
|
The Geometry Program is used to
enter and edit well geometry, and to calculate annular
section volume, lag depths and lag times. |
|
|
Multiwell log program |
|
The depth correlation facilities
allow the "matching" of data from 2 or more wells. |
|
|
Casing Run Program |
|
By using the casing run program,
the data engineer can define casing data during each phase
of drillings and produce a casing fill plot showing the
evolution of the hook load. |
|
|
Cement Program |
|
The cement
program is used to model the hydraulics and displacement of
primary (casing/liner) oil well cementing jobs. |
|
|
L.O.T program |
|
The L.O.T. is used to monitor in real
time, pressure tests on the computers (L.O.T., integrity test, motion
test ¡etc.). |
|
|
|
|
|
|
|
|